NSW SH-V | 3a Int. | P-LH
Details

NSW SH-V | 3a Int. | P-LH

<kuid2:209857:70325:5>

Author: Ranger_51
Kind: mosignal
Build: 4.5 (Trainz A New Era SP2 )
Size: 54.09KB
Uploaded: 2026-02-06
Downloads:
0
-
0
+

NSW SH-V | 3a Int. | P-LH

NSW Shunting Signal (Vertical form) | 1-Route + Int.
A 3-aspect intermediate shunting signal.
An intermediate shunting signal is placed between 2 running signals and should display PROCEEDE when the running signal displays PROCEED.
Post mounted varient.

    NSW SH-V | 3a Int. | P-LH
    art
  • line.jpg 11.08KB
  • routind.png 4.26KB
  • settingsbanner.jpg 14.73KB
  • config.txt 8.88KB
  • corona
  • light_green.texture.txt 55 bytes
  • light_green.tga 16.04KB
  • light_red.texture.txt 51 bytes
  • light_red.tga 16.04KB
  • light_yellow.texture.txt 57 bytes
  • light_yellow.tga 16.04KB
  • icon
  • img_nsw-sv_1s_i_p.jpg 35.33KB
  • model
  • target.fbx 24.88KB
  • target.trainzmesh 917 bytes
  • nswsigext.gs 550 bytes

User photos

No one has uploaded a photo of this object yet.