Whitrope Siding CONTAINS PAYWARE 4
<kuid:283805:100158>
Author: | tmz06003 |
Kind: | map |
Build: | 3.8 |
Size: | 217.68KB |
Uploaded: | 2025-06-30 |
Downloads: |
2
-
+
|
Whitrope Siding CONTAINS PAYWARE 4
THIS ROUTE IS FOR TRAINZ DRIVER 2 and may not work in any other version. CONTAINS PAYWARE you will need Scottish Highlands and Hawes Junction for missing assets. This is the home of the Waverley Route Heritage Association, website www.wrha.org.uk who have shunters, railbus RB004 and two class 142s. Trackplan correct to 2019 when the WRHA have laid approximately 800m of track from Whitrope tunnel in the north to Bridge 200 in the south.
- Whitrope Siding CONTAINS PAYWARE 4
- config.txt 9.21KB
- mapfile.bmk 330 bytes
- mapfile.gnd 217.72KB
- mapfile.lyr 23 bytes
- mapfile.obs 42.39KB
- mapfile.trc 32 bytes
- mapfile.trk 31.87KB
- thumbnail.jpg 68.56KB
User photos
No one has uploaded a photo of this object yet.
Comments:
Sign in to post a comment